高雄環狀輕軌(第一階段)統包工程 得標廠商:西班牙CAF及長鴻營造製作動畫
853Likes
215,142Views
2013Jan 11
什麼是無架空線系統, 高雄輕軌未來的形式 這裡都看得到~ 關心高雄的未來, 千萬不要錯過~ 好好花個五分鐘, 保證值回票價~ Kaohsiung light rail turnkey project (the first phase) animated films Project description: Length of route: 22.1 km(first phase:8.7km, All cantenary-free) LRT stops: 36 Construction cost: NT$ 16.500 billion Track work: 1.435mm standard gauge Light rail vehicles: vehicle width 2.65m, 100% low-floor Light rail stops: platform width 2.5 m, height 35 cm (to corporate with low-floor vehicle) Two-phase construction